Company News

The temporary bridge installation at the river Nenskra

Wednesday February 13th, 2019 in Company News

 Lifting works has been performed with the tandem of 25 t. and 70 t. XCMG mobile cranes.

 The temporary bridge will connect the left and the right banks of the river Nenskra. Taking Special Equipment across the river became possible only after the installation of the bridge. Liquidation works for the elimination of damages caused by Natural disaster in Svaneti was the first priority for Our Special Equipment.

Offers Lifting Operations of any complexity or scale for you in a Professional and High-Quality Manner.

JM Company – Save time and make construction easier with modern equipment.

Leave a Reply

Your email address will not be published. Required fields are marked *

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com